TEL: +86-0510-86573908-814
E-MAIL: mck@dlclx.cn
Categories
Contact Us
Jiangyin Deling Gearbox Co.,Ltd
Add:No.19 Yingbin Road Qiaoqi Industrial Park Jiangyin City, Jiangsu, China
Tel:+86-0510-86573908-814
Mob:+8613915307777
E-mail:mck@dlclx.cn
Knowledge
Home > Knowledge > Content
How to repair the early damage of the intermediate shaft of the transmission?
Oct 06, 2018

Due to lack of oil in the transmission, poor lubrication, untimely inspection and other aspects (accessory quality), etc., the roller bearings and journals on the front end of the intermediate shaft may be excessively worn. The surface of the journal has the same wear groove as the length of the roller. Or pitting, so that the intermediate shaft is damaged early.

 

First, there is no load check in the neutral. The front and rear axles of the car are firmly jacked up, the engine is started (the neutral gear is not stepped on the clutch), the throttle is increased, and the speed is repeatedly changed. When the speed is high and low, the metal noise is emitted inside the transmission, and the sound increases with the rotation speed. Increase, when the clutch is depressed, the sound disappears, that is, the intermediate shaft is damaged early. When the diagnosis road to one hundred and twelve block start running, increase the engine speed, this time within the transmission abnormal sound great; three or four, when the reverse gear to reduce the noise; when hanging five-speed, the noise disappears immediately (because fifth gear The power is transmitted directly through the two axes, at which time the intermediate shaft is unloaded and idling).

 

The intermediate journal wear is too limited, and the intermediate shaft size can be restored by a spray welding process, followed by heat treatment to meet the technical requirements.

 

New parts should be replaced without repair value. After the intermediate shaft is installed, the round nut at the rear end is tightened, and the nut lock piece is locked to avoid damage caused by the axial movement of the intermediate shaft after loosening.http://www.delinggearbox.com/

 


  • Contact Us
    Jiangyin Deling Gearbox Co.,Ltd
    Add:No.19 Yingbin Road Qiaoqi Industrial Park Jiangyin City, Jiangsu, China
    Tel:+86-0510-86573908-814
    Mob:+8613915307777
    E-mail:mck@dlclx.cn
  • Categories
  • Copyright © Jiangyin Deling Gearbox Co.,Ltd. All Rights Reserved.